Wells new Shannon boathouse
Wells Boathouse Build

New boathouse build

  Newer post...
Older post...  

Works restart after Christmas

Friday 22 Jan 2021

Since remobilising after the Christmas Shutdown the concrete works and service installation has progressed well, with much of the ILB ramp constructed as well as a good proportion of drainage, tanks and service ducts in and around the building slab installed. Preparation works for the ALB ramp continue, with filling and cutting down of the piles plus works to the gabions ready for the installation of the steelwork planned to commence from the 8th February. Concrete works will continue onto the sheet pile capping beam the rest of the month into early February; followed by the concrete works to the building slab.

 

Concrete works for the ILB ramp

Concrete works for the ILB ramp
15/1/21 Mackley

Preparation work for the ILB ramp

Preparation work for the ILB ramp
16/1/21 RW

Concrete works for the ILB ramp

Concrete works for the ILB ramp
16/1/21 RW

Concrete works for the ILB ramp

Concrete works for the ILB ramp
16/1/21 RW

Concrete poured for lower section of ILB ramp

Concrete poured for lower section of ILB ramp
16/1/21 RW

Drainage systems being installed

Drainage systems being installed
16/1/21 RW

Drainage and service works on the main site

Drainage and service works on the main site
21/1/21 RW

Service works on the main site

Service works on the main site
22/1/21 Mackley

Cutting and filing works to the piles for the main ramp

Cutting and filing works to the piles for the main ramp
22/1/21 Mackley